Passenger lift
For condos, offices and hotels
A quiet, smooth ride. Certified with DOSH. Looked after by the same team that installs it.
- Capacity410 – 1600 kg
- Speed1.0 – 3.0 m/s
- Machine roomWith or without
- CertifiedEN 81 · DOSH
Passenger lifts · Supply & install
For condos, offices and hotels. We supply, install and certify with DOSH. Then we look after them. 60+ installed so far.
Representative image
Passenger lift
A quiet, smooth ride. Certified with DOSH. Looked after by the same team that installs it.
Choosing a lift
Three choices decide most of a passenger lift. We make them with you at the site visit.
| Rated load | People | Typical building |
|---|---|---|
| 410 kg | 5 | Small walk-up apartments, shop-houses |
| 630 kg | 8 | Low-rise apartments, small offices |
| 1000 kg | 13 | Condominiums, offices, hotels |
| 1350 kg | 18 | Busy offices, hotels with luggage |
| 1600 kg | 21 | High-rise, hospitals, large offices |
1.0 m/s suits buildings up to about eight storeys. 1.5 to 1.75 m/s suits most condominiums and offices. 2.0 to 3.0 m/s is for high-rise towers, where waiting time matters more than cost.
A machine-room-less lift puts the machine at the top of the shaft and saves a room on the roof. A machine room is easier to maintain and suits taller and busier buildings. Both are available.
We test the lift, arrange the JKKP (DOSH) inspection and hand over the Certificate of Fitness. Then the same team maintains it: monthly visits, three-monthly examinations and every renewal.
How it works
Common questions
410 kg carries about 5 people, 630 kg about 8, 1000 kg about 13 and 1600 kg about 21. We size the lift to your floors, traffic and building type.
Both are available. A machine-room-less lift puts the machine at the top of the shaft and saves a room on the roof. A machine room is easier to maintain and suits taller buildings. We recommend one based on your building.
Our own passenger lift line, specified for Malaysian buildings and installed and certified by LNE. Capacities 410 to 1600 kg, speeds 1.0 to 3.0 m/s. We also maintain and modernise lifts of every other brand.
Yes. If the old lift is beyond economic repair we remove it and install new. If it is sound, we usually recommend modernisation first, because it costs far less.
We do. After installation we test the lift, arrange the JKKP (DOSH) inspection and hand over the Certificate of Fitness with the lift.
Yes. The team that installs your lift maintains it: monthly visits, three-monthly examinations and the Certificate of Fitness renewals.
Manufacture, delivery and installation each take time. We give you a programme in the quote once the shaft is measured or the drawings are checked.
We confirm your free site visit by WhatsApp.